01

What can I confirm before receiving the keys?

List room uses, equipment to retain and the three most important jobs. Use the initial estimate to explore budget options. Plans alone cannot confirm walls, floor conditions, pipes or every dimension.

CompanyRenovation quotation guide and CalculatorIt can help define the scope. Read the result alongside its assumptions and exclusions.[1]

02

Give every bidder the same information first

Prepare the plan, saleable area, items to retain or replace and expected handover date. Date photos from the agent or another person rather than assuming they show current conditions.

Separate essential, optional and deferrable work. If the budget covers only part, ask what access must be kept for later work. Returning later may affect cost or finishes.

What can be done before handover and what still needs confirmation

You can swipe left or right on your phone to view the complete table.

InformationWhat can be done before handoverAwaiting site verification
Floor planMark intended uses and furniture needsDimensions, beams, columns and finishing
Kitchen and bathroomList equipment to keep or replaceConnections, substrate and work scope
Painting and flooringList rooms and preferred finishesMeasurement, substrates and repairs
timeList expected handover and move-in datesAccess, management and supply

Editorial enquiry preparation sheet. It is not construction approval.

03

Is the amount an estimate or a confirmed quotation?

Use the plan estimate to compare approaches. Narrow the work list after checking the site. The formal quotation should state materials, quantities, inclusions, exclusions, duration and payment terms.

Mark unpriced items “to be confirmed” rather than zero. Keep options out of the essential total and keep planning allowances separate from agreed works.[1]

Illustrative scenario or worked example 1

Handover may be delayed

Assumptions

  • Assume the key collection arrangements are not yet confirmed.

Checks to make

  1. Prepare the work list and outline budget first.
  2. Mark measurement and order dates as provisional.
  3. Recheck the programme when the dates change.

Record what each date depends on so an estimate is not mistaken for a commitment.

Illustrative planning scenario. It does not represent a customer project, quotation or schedule commitment.

04

Measure after handover and focus on the outstanding checks

Check estimate assumptions on site, including wall areas, floor conditions, equipment connections, fixed cabinets and access routes. Photos help communication but do not replace necessary inspections.

Record defects and agree who will rectify them before new renovation conceals the problem. SeeProperty handover inspection guideDocument the problem locations. This article does not give DIY instructions for opening or inspecting installations.[2]

05

Handover, site access and moving in: three separate dates

If handover changes, reconfirm measurement, material orders, construction and move-in. An expected key date is not permission to start work.

Check management rules and available delivery hours, then have the contractor confirm scheduling. Do not fix custom dimensions before measurement. Ask early about lead times for made-to-order items.

Verify expected handover, confirmed access and preferred move-in dates separately
Confirm the three dates separately. Company project photos accompany editorial planning diagrams and do not establish a promised schedule. Select an image to enlarge

06

Compare two quotations by marking differences in scope first

One quote includes removal, repairs and waste disposal while the other covers only finishes. Have both firms complete the same list of outstanding items before comparing totals.

Record the reason, cost and schedule impact of any change or extra work and obtain approval before arranging it. Even on a tight schedule, do not treat a verbal discussion as agreement on the complete scope.[1]

Estimate comparison record

You can swipe left or right on your phone to view the complete table.

ItemQuotation AQuotation BNext
Scope and quantitiesUse the written wordingUse the written wordingAlign the pricing scope first
Inclusions and exclusionsUse the written wordingUse the written wordingMark unclear items for confirmation
Optional workPrice separatelyPrice separatelyDo not add it to the total twice
Dates and assumptionsUse the written wordingUse the written wordingRecord outstanding conditions

Do not treat blanks or unknowns as zero. No unverified prices are shown. [1]

Illustrative scenario or worked example 2

Keep the kitchen cabinets and alter other areas

Assumptions

  • Assume there has been no access to inspect the existing cabinets.

Checks to make

  1. List the items you hope to retain first.
  2. Check equipment, connections and finishing details on site.
  3. Agree the cost and impact of any additional work before it is arranged.

Confirm what can be retained before comparing complete schemes.

Illustrative planning scenario. It does not represent a customer project, quotation or schedule commitment.

07

How can I keep my options open if dates are uncertain?

Agree room uses and items to retain. Record what can and cannot change separately. Confirm custom sizes, actual connections and access dates later.

The following scenarios illustrate planning. They are not customer cases or commitments on time or price. Use them to identify missing information.

08

Start the enquiry with a short brief

Provide the district, saleable area, expected handover, essential work, budget range and current access. Mark unknowns for verification. You do not need to answer every technical question first.

For an overview of the whole scope, seeWhole-home renovation services, then send the floor plan using the WhatsApp button on this page. The site assessment and written quotation confirm the formal scope and costs.

FAQ

6 practical questions answered

01Can I get an indicative budget before handover?

Yes. Use the plan and requirements to discuss options, clearly noting assumptions and site checks.

02Is the area on the plan the pricing area for every trade?

No. Wall finishes, flooring, equipment and custom work each have their own scope and must be confirmed separately.

03Can I enter zero for unconfirmed items?

No. Zero can imply that an item is free or included. Mark it “to be confirmed” and record the next step.

04Does the expected handover date mean work can start that day?

No. Confirm access, management arrangements, the contractor's programme and supply dates.

05Can custom furniture dimensions be finalised before measurement?

Do not use plan dimensions as approved production sizes. Measure and verify them on site first.

06Are photos enough to replace a site assessment?

Photos help the first discussion. Verify actual dimensions, substrates and concealed conditions on site as needed.

CHECK THE BASIS

Data and technical basis, sources can be verified