01
A common misconception: new flats do not need inspection
Many owners arrange for measurements as soon as they collect the keys. New flats can still have cracked walls, buckled floors, leaks around windows, uneven cabinet doors, slow drains or dead sockets. The Consumer Council has reported poor defect repairs and urged developers to improve them to reduce disputes[3].
The Sales of First-hand Residential Properties Authority explains that a purchaser may notify the vendor in writing within 6 months after completion of the sale and purchase of any defect in the property or in the fittings, finishes and appliances specified in the agreement, provided it was not caused by the purchaser's actions or neglect. The vendor must remedy it at its own cost as soon as reasonably practicable after receiving notice[2].
The important condition is that the defect was not caused by the purchaser's actions or neglect. If a tradesperson scratches the flooring or drills through a pipe during renovation, it is difficult to hold the developer responsible. For that reason,New flat renovationstarts withFlat inspection, fix defects first, then renovate.
The Authority also advises buyers to inspect the property carefully at handover, check it against the sales brochure and keep a written record of both parties' requests and replies when dealing with defects[2]. Keep these records in case of a later dispute.
- Inspect new flats too
- Notify the vendor in writing within 6 months after completion
- Damage caused by the purchaser is excluded
- Record all requested defect repairs in writing
- Flat inspectionCheck against the sales brochure
- Submit defects in writingWithin 6 months
- Discuss the designDuring defect rectification
- Site measurementAfter defect rectification
- Production and installation2–4 weeks

02
Order of work for a new flat
Step 1. Take possession and inspect in week 1. Check every room, photograph defects and compare the finishes with the schedule in the sales brochure. Step 2. Report defects in writing in weeks 1 to 2. Send the complete list to the developer's customer service department and keep a copy.
Step 3. Wait for defect repairs, typically weeks 2 to 8 depending on the developer. Use that time to discuss the design, preliminary layout and quote. Step 4. Take final measurements once repairs finish. Re-skimming a wall or replacing a cabinet door can change the dimensions available for furniture.
Step 5. Approve the production drawings and release the furniture order to the workshop. Allow about 2 to 4 weeks for production. Step 6. Install and clean. New flats seldom need wet trades, so the furniture can go in on delivery. Installation usually takes one to three days.
If repairs are taking too long, consider working room by room. Measure and order for rooms with no defects and wait until repairs finish elsewhere. Tell the designer so the two batches of furniture match in material and colour.
- Handover and inspection
- Submit defects in writing
- Discuss design while defects are being rectified
- Measure after defect rectification
- Production: 2–4 weeks
- Installation and cleaning
You can swipe left or right on your phone to view the complete table.
| Item | New-build flat | Reason | indicative price |
|---|---|---|---|
| Custom wardrobes, beds and shoe cabinets | Required | Rarely included in new flats | FUR05 from HK$2,900 per linear foot |
| Add sockets and network points | Usually required | Coordinate with the furniture layout | H02: HK$640 per set |
| Form a curtain pelmet | As needed | Often absent in new flats | F04: HK$460 per linear ft |
| clean | Required | Furniture installation leaves sawdust | L01: HK$16 per sq ft |
| Demolition of kitchen and toilet | Not required | New and under warranty | — |
| Floor replacement | Not required | in good condition | — |
| repainting | Unnecessary unless changing colour | New paint | E03: HK$12 per sq ft |
| Alter the layout | Not recommended | May qualify as minor works and affect warranty coverage | — |

03
New-flat works 1: custom furniture
New flats tend to be compact, with tightly planned layouts,Bespoke furnitureis the main expense when fitting out a new flat. The Rating and Valuation Department forecasts that about 58% of private homes due for completion in 2026 will be in the New Territories[4]. Many are two-bedroom or compact three-bedroom flats with limited storage.
Wardrobes. New flats seldom come with wardrobes, and when they do, the built-in unit is usually small. HK Create Design's FUR05 wardrobe costs HK$2,900 per linear foot and includes one hanging rail, three shelves, two drawers and sliding-door tracks[1]. Main-bedroom wardrobes are commonly 5–7 ft wide.
Beds: smaller bedrooms often cannot fit a standard bed and a separate desk,Platform bedsis the most common solution. The FUR06 platform bed costs HK$340 per sq ft and includes the frame, storage compartments and either lift-up lids or drawers[1]. A desk can extend from the side of the platform. The FUR08 desk costs HK$1,850 per linear foot[1].
Hall and living room. Many new flats have no dedicated space for shoes by the door. A full-height hall cabinet is one option. FUR12 costs HK$2,900 per linear foot[1]. FUR10 low living-room TV cabinets cost HK$1,250 per linear foot[1]. Our custom furniture uses ENF-grade panels as standard, with a formaldehyde limit of 0.025 mg per cubic metre[9].
- FUR05 wardrobe: HK$2,900 per linear ft
- FUR06 platform bed: HK$340 per sq ft
- FUR08 desk — HK$1,850 per linear foot
- FUR12 tall hall cabinet — HK$2,900 per linear foot
「We always advise owners of new flats to get defects rectified first. We can draw up plans and quote while repairs are under way, then measure as soon as they finish. This saves rework without holding up the project.」

04
New-flat works 2: sockets and lighting
Standard socket positions in a new flat may not suit your furniture. Common additions include sockets on both sides of the bed, a data outlet at the TV wall, sockets at the desk and appliance outlets in the kitchen. An H02 additional single 13A socket costs HK$640 per point. An H03 double socket, TV or data outlet costs HK$1,200 per point[1].
The Electrical and Mechanical Services Department says that installation, additions or alterations to a fixed electrical installation must be carried out by a registered electrical contractor. A work completion certificate must be issued on completion (WR1) [6]. If the flat is still within the defects period, check with the developer before changing the wiring so you know how this affects the warranty.
The light fittings supplied in new flats are generally basic. H05 pendant or ceiling light installation costs HK$670 per fitting, with the customer supplying the light. H08 spotlights are HK$310 each supplied and installed. H07 strip lighting is HK$150 per linear foot[1]. FUR40 internal LED strips can be fitted inside wardrobes and bookcases at HK$150 per linear foot[1].
Install extra sockets and lighting points before ordering custom furniture so that cable routes and openings can be planned. Adding sockets after installation means cutting into finished units. List each appliance and charging point, then confirm each position with the designer.
- H02 additional socket: HK$640 per point
- H03 double socket, TV or data outlet — HK$1,200 per point
- Registered electrical contractor to carry out the work and issue a WR1 certificate
- Add sockets before fitting furniture


05
Work for a new flat, part 3 — curtains, cleaning and protection
Curtain pelmets. Many new flats have no pelmet and a track mounted directly on the ceiling can look untidy. The F04 plasterboard or plywood pelmet leaves space for the track and costs HK$460 per linear foot, with an 8 ft minimum[1]. If you do not want a suspended ceiling, a curtain pelmet on its own will work.
Cleaning. There is often dust in a newly handed-over flat and more sawdust after furniture installation. L01 RenoClean Post-renovation cleaningand formaldehyde treatment at HK$16 per sq ft[1]. The Consumer Council notes that the apparent effectiveness of formaldehyde removal services depends on the measurement method and ventilation conditions[8]. Choosing low-formaldehyde panels and providing plenty of ventilation are therefore the most effective measures.
Protection. Protect the developer's flooring, kitchen cabinets and sanitary fittings during renovation. Before work starts, our team covers the floors, kitchen worktops and door frames to prevent scratches. The developer is not responsible for damage caused by renovation[2].
Check the management office's rules on renovation deposits, working hours, lift protection and worker registration. Many residents may be renovating at once in a newly occupied estate, so book delivery lift slots in advance.
- F04 curtain pelmet: HK$460 per linear foot
- L01 cleaning: HK$16 per sq ft
- Protect the floor and kitchen cabinets before work
- Book a delivery slot with management
Example: 350 sq ft two-bedroom new-build flat
Assumptions
- 5 ft main-bedroom wardrobe
- Small-room platform bed with 3 ft desk
- 2 ft tall entrance cabinet and 5 ft low TV unit
- Add 3 sockets and replace 3 lights
How to calculate quantities
- FUR05:5 × HK$2,900 = HK$14,500
- FUR06:39 × HK$340 = HK$13,260;FUR08:3 × HK$1,850 = HK$5,550
- FUR12:2 × HK$2,900 = HK$5,800;FUR10:5 × HK$1,250 = HK$6,250
- H02:3 × HK$640 = HK$1,920;H05:3 × HK$670 = HK$2,010
- L01:350 × HK$16 = HK$5,600;FUR42:HK$660
- Total: HK$55,550
Example total of about HK$55,550.
Curtains, light fittings and mattresses are excluded. The final price depends on site measurements and the written quotation. [1]
- RequiredCustom furniture, power and data outlets, lighting, curtain pelmets and cleaning
- Usually unnecessaryStripping out kitchens and bathrooms, replacing floors, repainting unless changing colour, extensive suspended ceilings and layout alterations

06
Work a new flat usually does not need
First, keep the new kitchen and bathroom. They already have waterproofing and warranty coverage. Stripping them out costs money and can invalidate the developer's warranty. If it is only the cabinet colour you dislike, consider replacing the doors.
Second, there is usually no need forFloor replacement. Most new flats already have timber or tiled floors, which can stay if in good condition. Third, keep the fresh paint unless you want a different colour. E03 direct repainting throughout the flat costs HK$12 per sq ft[1], preferably after defect rectification.
Fourth, limit suspended ceilings. Ceiling heights in new flats are often modest and too much suspended ceiling makes rooms feel cramped. A curtain pelmet and a local lighting cove are usually enough to conceal tracks or light strips. F03 lighting coves cost HK$460 per linear foot[1].
Fifth, keep the existing layout. New flats are generally designed to meet statutory requirements. Altering a non-structural wall may be minor works subject to the Minor Works Control System[5]. Removing walls can also affect the developer's warranty. Check the implications before deciding to proceed.
- Keep the fitted kitchen and bathroom
- Retain the existing flooring
- Repainting generally unnecessary unless changing colour
- Limit false ceilings
- Check before changing partitions
07
Sample new-flat renovation budgets
These examples use HK Create Design's published 2026 rates[1]. Example 1, a 350 sq ft two-bedroom new flat. A 5 ft main-bedroom wardrobe, a 6 × 6.5 ft platform bed and 3 ft desk in the small bedroom, a 2 ft tall hall shoe cabinet, a 5 ft low TV unit, three extra sockets, three replacement lights, whole-flat cleaning and one delivery come to about HK$55,550.
Example 2, a 500 sq ft three-bedroom new flat. Allow for a 7 ft main-bedroom wardrobe, a 4 ft wardrobe and hydraulic lift-up bed in the first small bedroom, a platform bed and 4 ft desk in the second, a 7 ft low TV unit, a 3 ft tall hall shoe cabinet, a 4 ft sideboard, 15 ft of strip lighting, four extra sockets, whole-flat cleaning and one delivery. Total about HK$100,905.
Both examples exclude demolition, flooring and painting because new flats seldom need these. Renovating a second-hand flat of the same size can cost more than twice as much.
For a quick budget we usually suggest owners set aside a 20% contingency of their own. This is not a company fee. It allows for unusual finishing details, dimensions that change after repairs or extra sockets.
- 350 sq ft, two bedrooms — about HK$55,550
- 500 sq ft, three bedrooms — about HK$100,905
- Excludes demolition, flooring and painting
- Set aside a 20% contingency in your own budget
You can swipe left or right on your phone to view the complete table.
| Year | Completions | Category | Source |
|---|---|---|---|
| 2021 | 14,390 | Actual | Rating and Valuation Department |
| 2022 | 21,170 | Actual | Rating and Valuation Department |
| 2023 | 13,850 | Actual | Rating and Valuation Department |
| 2024 | 24,260 | Actual | Rating and Valuation Department |
| 2025 | 18,450 | Actual | Rating and Valuation Department |
| 2026 | 16,980 | Forecast | Rating and Valuation Department |
| 2027 | 15,360 | Forecast | Rating and Valuation Department |
Preliminary figures from the Hong Kong Property Review 2026. [4]

08
Design tips for a compact new flat
Tip 1. Take wardrobes to the ceiling. New flats commonly have ceilings around 2.6 to 2.8 metres high. A top compartment gives you room for seasonal clothes and suitcases. FUR01 tall cabinets have a standard height of up to 2,400 mm. FUR04 adds HK$100 per linear foot for every additional 100 mm of height[1].
Tip 2. Use the window ledge. In many new flats you can build a cushioned window-seat cabinet or extend a platform bed to the ledge. The FUR02 half-height cabinet suits a window seat and costs HK$1,350 per linear foot[1].
Tip 3. Add wall cabinets above the bedhead in the main bedroom to store bedding and other items in otherwise unused space. Tip 4. Fit a mirror to one door of the tall hall cabinet. It is handy on the way out and makes the entrance look larger.
Tip 5. Keep the palette consistent. Coordinating cabinet doors, floors and walls, for example with white and light woodgrain, can make a small flat look larger and tidier. HK Create Design has four books of panel colours available to view by appointment in the showroom. Check physical samples in daylight in your flat too. Lighting and window orientation can change how the same colour looks.
- Take the wardrobe to the ceiling
- Use the window sill for storage or extend the platform
- Install overhead storage above the headboard
- Mirrored entrance cabinet door
- Coordinate the colour palette

09
How to allocate a new-flat renovation budget
New owners also need to cover the down payment, stamp duty, legal fees, furniture and appliances, so the renovation budget is often tighter than expected. First fund the essentials for moving in, such as wardrobes, beds, a shoe cabinet and necessary sockets. Then consider items that make daily life easier, such as a desk, sideboard or strip lights. Decorative walls, special paint finishes and extra suspended ceilings can come later.
In the 350 sq ft two-bedroom example, the wardrobe, bed and desk account for about 60% of the HK$55,550. Sockets and lighting make up under 10%, and cleaning and delivery about 10%. With a tighter budget, start with the main-bedroom wardrobe and the platform bed in the small bedroom. The shoe cabinet and TV unit can be fitted after move-in with little disruption.
Allow for appliances and furnishings too. A fridge, washing machine, air conditioner if needed, mattresses, sofa and curtains can add tens of thousands of Hong Kong dollars. Owners who budget only for the renovation often find there is little left for the mattress by move-in day.
Renovation firms generally take staged payments, such as a deposit on ordering, a payment before production and another after installation. The Consumer Council recommends putting the payment schedule and warranty terms in the quotation[10]. HK Create Design's quotation sets out each instalment and the work it covers. We collect the final payment after the customer accepts the completed work. All works have a one-year warranty.
- First priority: wardrobes, beds, shoe cabinet and sockets
- Second priority: desk, sideboard and strip lighting
- Allow separately for appliances and furnishings
- Stage payments and settle the balance after completion
- 6 monthsDefect notification periodAfter the completion date
- 16,9802026 completionsForecast private housing completions
- 58%In the New Territories2026 forecast
Sales of First-hand Residential Properties Authority and Rating and Valuation Department.
10
Common mistakes when renovating a new flat
First, fitting furniture before defects are rectified. It can block the developer's access, or you may have to pay for its removal so that repairs can go ahead. Complete the repairs before renovating[2].
Second, reporting defects without a written record. A verbal report to the management office is difficult to pursue once the 6 months have passed. The Authority advises both parties to keep written records of requests and replies[2].
Third, damaging finishes supplied by the developer. Floor scratches and chipped kitchen cabinets caused by a lack of protection are the owner's responsibility. Fourth, accepting an unclear quotation. The Consumer Council suggests checking 12 areas, including materials, quantities, payment and warranty terms[10].
Fifth, moving in immediately after installation. New furniture and paint need time to air out. The Environmental Protection Department notes that renovation materials can affect indoor air quality[7], then open the windows for several days before moving in.
- Complete defect rectification before renovation
- Keep written defect records
- Protect existing finishes
- Itemise the quotation
- Ventilate before moving in
Example: new 500 sq ft three-bedroom flat
Assumptions
- 7 ft main-bedroom wardrobe
- Small bedroom 1: 4 ft wardrobe and hydraulic storage bed
- Small bedroom 2: platform bed with 4 ft desk
- TV unit, tall hall cabinet, sideboard, LED strip and four sockets
How to calculate quantities
- FUR05:7 × HK$2,900 = HK$20,300;4 × HK$2,900 = HK$11,600
- FUR07:6.5 × HK$1,850 = HK$12,025;FUR06:39 × HK$340 = HK$13,260
- FUR08:4 × HK$1,850 = HK$7,400;FUR10:7 × HK$1,250 = HK$8,750
- FUR12:3 × HK$2,900 = HK$8,700;FUR13:4 × HK$1,350 = HK$5,400
- H07:15 × HK$150 = HK$2,250;H02:4 × HK$640 = HK$2,560
- L01, 500 × HK$16 = HK$8,000. FUR42, HK$660. Total HK$100,905.
Example total of about HK$100,905.
Curtain pelmets, light fittings and hardware upgrades are excluded. The final price depends on site measurements and the written quotation. [1]

11
Renovating a new flat versus a second-hand flat
New flats usually need no demolition or wet trades. The budget goes mainly on furniture and electrical work, and furniture manufacture and installation take around three to five weeks. Allow for defect repairs and plan the smaller floor area carefully.
Second-hand flats may need a kitchen and bathroom strip-out, new flooring, repainting, rewiring and replumbing. Budget and programme are usually larger, although the layout is often more practical and offers scope for major changes.
New-flat owners can spend some of the savings on demolition and wet trades on better furniture hardware. The FUR31 Blum or Hettich soft-close hinge upgrade costs HK$380 per hinge, and the FUR32 Blum TANDEMBOX drawer runner upgrade costs HK$1,500 per set[1]. Hardware helps determine how long furniture will last, so it is worth investing in.
HK Create Design includes design work and drawings for the whole flat, whether new or second-hand, so that you can see the proposed result before ordering.
- New flat: mainly furniture, with a shorter programme
- Resale flat: more wet trades and a longer programme
- Allocate some of the new-flat budget to hardware
- Includes design and a full set of drawings for the flat
12
Renovate a new flat with HK CreateDesign
HK Create Design has worked with owners of new flats, second-hand flats, public housing and village houses since 2019. Our designers work alongside tradespeople with more than 15 years of experience. New-flat owners can discuss the design during defect repairs and place the order after final measurements once repairs finish.
WhatsApp 5243 7747 with the floor plan from the sales brochure for a free preliminary design and quotation. For two or more items of work, site measurement is free until 31 December 2026. After that, an L04 site visit costs HK$500, fully deducted when you confirm the order[1].
Our showroom is at Shop 16, G/F, Fu Yau Building, 61 Po Kong Village Road, Wong Tai Sin, Kowloon. Book a visit to see panel colours and hardware samples. All works have a one-year warranty.
- WhatsApp 5243 7747
- A sales brochure floor plan is enough for preliminary design
- Free measurement for a limited period, then HK$500 credited against a confirmed order
- One-year warranty
Advice from our tradespeople
「We always advise owners of new flats to get defects rectified first. We can draw up plans and quote while repairs are under way, then measure as soon as they finish. This saves rework without holding up the project.」
「Before starting in a new flat, we lay floor protection and cover the kitchen worktops. The developer will not cover scratches caused by the renovation, so protect the original finishes properly.」
FAQ
9 practical questions answered
01How soon must I tell the developer about defects in a new flat?
The purchaser can notify the vendor in writing within 6 months after completion of the sale and purchase. The vendor must remedy the defects at its own expense as soon as reasonably practicable.[2].
02When should I start renovating after handover?
Inspect the flat and record defects in writing. After rectification, arrange measurement and renovation. Design and quotation discussions can proceed during snagging.
03Does a new-build flat need repainting?
Usually unnecessary unless you want a different colour. E03 direct repainting throughout the flat costs HK$12 per sq ft and is best done after defect repairs.[1].
04What should I check before adding sockets in a new-build flat?
must be carried out by a registered electrical contractor, who must issue a work completion certificate afterwards[6]. Complete this before fitting the custom furniture.
05How much does it cost to renovate a new 350 sq ft flat?
The two-bedroom example includes a wardrobe, platform bed, desk, shoe cabinet, TV unit, sockets and lighting for about HK$55,550.[1].
06What if renovation work scratches the developer's flooring?
The vendor is not responsible for defects caused by the purchaser's actions or neglect.[2], so protect existing finishes thoroughly before work.
07How long after new-build defects are rectified can renovation begin?
It depends on the developer and number of defects, typically a few weeks to two months. Discuss design and rates during snagging, measure immediately after repairs and allow about two to four weeks for furniture production.
08How should I allocate a limited renovation budget for a new flat?
Start with move-in essentials: wardrobe, bed, shoe cabinet and required sockets. Desks, sideboards and strip lights come next, then decorative items. Budget separately for appliances, mattresses and curtains.
09Can I remove and replace the kitchen cabinets in a new-build flat?
Yes, although it may offer poor value. New doors or extra wall cabinets can improve appearance and storage while retaining the developer's warranty.
CHECK THE BASIS
Data and technical basis, sources can be verified
- [1]HK Create Design published 2026 rates and work item descriptions Accessed: 2026-11-03
- [2]First-hand Residential Properties Sales Authority: Found any defects after taking possession of the property? what to do? Accessed: 2026-11-03
- [3]Consumer Council: Defects in new flats can drag on. Developers urged to improve rectification and avoid disputes (15 June 2022). Accessed: 2026-11-03
- [4]Rating and Valuation Department, Hong Kong Property Review 2026 — preliminary findings Accessed: 2026-11-03
- [5]Buildings Department: Minor Works Control System Accessed: 2026-11-03
- [6]Electrical and Mechanical Services Department: Household Electrical Safety Handbook, new installations, additions and alterations Accessed: 2026-11-03
- [7]Environmental Protection Department: Indoor Air Quality Information Centre FAQs Accessed: 2026-11-03
- [8]Consumer Council: questions and answers on measuring and removing formaldehyde after home renovation Accessed: 2026-11-03
- [9]STC: China Market Watch (August 2021) on the new formaldehyde emission grading standard for wood-based panels and finishing products Accessed: 2026-11-03
- [10]Consumer Council: Renovation quotations should be detailed and teach you one by one in 12 major areas Accessed: 2026-11-03