01

What is a New Territories Exempted House?

A New Territories Exempted House is generally a village house in the New Territories exempt under the Buildings Ordinance (Application to the New Territories) Ordinance. This includes Small Houses built by eligible indigenous villagers under the Small House Policy[1]. Exemption concerns advance approval of plans and consent to start from the Buildings Department, provided the house stays within the applicable conditions.

For newer exempt houses, the Buildings Department lists a maximum of three storeys, 8.23 m high (about 27 ft) and 65.03 m² (about 700 sq ft) roofed-over area[1]. Exemption from prior building approval leaves land lease and grant conditions in effect[5]. The Lands Department handles land grants for New Territories village houses[6].

A New Territories building completed before 1 January 1961 and never subsequently altered, extended or rebuilt falls outside this definition of unauthorised building works, whether or not it satisfies the exemption criteria[1]. Older village houses and newer Small Houses can have quite different records. Establish which category the property falls into before buying or renovating.

  • Exemption from prior Buildings Department plan approval
  • Three storeys, 8.23 m and 65.03 m²
  • Land lease restrictions still apply
  • Special position of unaltered pre-1961 buildings
Whole-home renovation on site | HK Create Design
Renovation project photo | HK Create Design Select an image to enlarge

02

Could the renovation invalidate the exemption?

The Buildings Department explains that an addition, alteration or minor work that takes the house beyond its prescribed height, roofed-over area or other exemption conditions can invalidate the exemption. The work is unauthorised and the house becomes non-compliant[1].

Typical examples are a covered rooftop room, an added ground-floor kitchen, or a balcony enclosed with glass andAluminium windowsto create indoor space. These changes can exceed the permitted roofed-over area or height and need assessment as building works.

Internal work such as painting, new floors, cabinet replacement, sanitaryware orBespoke wardrobe, generally leave the exemption unaffected if the external form, height and roofed-over area stay unchanged. Our village-house work mainly covers this kind of internal renovation andBespoke furniture.

Many older village-house walls carry loads even when they look like partitions. New or enlarged windows alter the façade. Have a registered structural engineer or authorised person assess either proposal first.

  • Exceeding the conditions invalidates the exemption
  • Assess roof structures, ground-floor extensions and balcony enclosures
  • Internal work generally leaves the exemption unaffected
  • Have walls and new window openings professionally assessed
Typical dimensions of small facilities exempt from approval

You can swipe left or right on your phone to view the complete table.

FacilityPrincipal limitsRemarksSource
Metal air-conditioner bracketProjection up to 750 mmProvide anti-drip protectionBuildings Department
Cage-type external window grilleProjection up to 500 mmUp to 150 mm projection over accessible pavement with clearance below 2.5 mBuildings Department
Ground-floor roller shutter or folding gateProjection up to 300 mmRoller shutter escape door at least 600 mm wideBuildings Department
CanopyProjection up to 750 mmMust not project from a balconyBuildings Department
Rooftop gardening trellisUp to 5 m² in area and 2.5 m highOpen and uncoveredBuildings Department
Rooftop storage cabinetHeight up to 2 m and volume up to 3 m³PrefabricatedBuildings Department

Based on the Buildings Department's list of green and amenity facilities for New Territories Exempted Houses. Check the current details for each installation. [2]

HK Create Design・Illustrated overviewSmall facilities exempt from approval
  1. Air-conditioner brackets≤750mm
  2. Window grille≤500mm
  3. Roller shutter≤300mm
  4. Gardening trellis≤5㎡
  5. Solar panels≤2.5m
  6. Storage cabinet≤3m³
Village house renovation rules: key figures illustrated | HK Create Design
Village house renovation rules: key figures at a glance | HK Create Design Select an image to enlarge

03

Qualifying green and amenity facilities

For a validly exempt house, specified small green and amenity facilities may be retained or installed without prior permission from the Lands or Buildings Department if they meet all relevant conditions[2]. Check the full limits before including any of these items in the renovation.

The bracket needs an anti-drip design, may project up to 750 mm from an external wall, and must not project from a balcony or canopy[2]. External cage grilles may project up to 500 mm. Any section above an accessible pavement with less than 2.5 m headroom is limited to 150 mm[2].

A ground-floor security roller shutter or folding gate may project no more than 300 mm. A roller shutter needs an escape door at least 600 mm wide[2]. A qualifying canopy may project no more than 750 mm from the external wall[2].

Roof facilities include an open gardening trellis up to 5 m² and 2.5 m high, a prefabricated storage cabinet up to 2 m high and 3 m³ in volume, and a mesh fence or railing up to 2.5 m high, subject to the relevant conditions[2].

  • AC bracket: maximum 750 mm projection and anti-drip design
  • Window grilles: up to 500 mm projection
  • Roller shutter: up to 300 mm projection and a 600 mm escape door
  • Rooftop trellis: up to 5 m² and 2.5 m high
HK Create Design・Figures at a glanceThree main conditions for exempted houses
  1. 3 floorsNumber of storeysNo more than
  2. 8.23mHeightUp to
  3. 65.03㎡Roofed-over areaUp to

Buildings Department information.

「Owners often ask about enclosing a balcony. We explain that a qualifying historic enclosure can fall under the reporting scheme, while a new enclosure is a different matter, before agreeing how to allocate the budget.」

Project supervisor, HK Create Design
Small amenity features for a village house (design rendering) | HK Create Design
Design illustration: Small amenity features in a village house. The final design follows the site measurements and design drawings. HK Create Design. Select an image to enlarge

04

Requirements for solar panels and aerials

On the main roof, a photovoltaic system including supports may be no higher than 2.5 m, impose an average load of up to 150 kg/m² and project no more than 750 mm from the external wall[2].

A continuous array may cover up to half the house's roofed-over area. In a clustered design, each cluster may cover up to 5 m², with at least 1 m between clusters[2]. A system more than 1.5 m high needs certification by an authorised person and a safety certificate lodged with the Lands Department[2].

Small aerials, satellite dishes and qualifying solar water-heating equipment have a total weight limit of 700 kg. Average loading is at most 150 kg/m² on the roof or 75 kg/m² on the stairhood roof. They must not go on a canopy[2].

Waterproof the roof before installing panels if the existing layer needs renewal. C01 SikaTop Seal-107 is HK$39/sq ft[7]. Once panels are in place, accessing the roof membrane may require removing them, increasing the cost.

  • Main roof solar panels: up to 2.5 m and 150 kg/m²
  • Continuous array: up to half the roofed-over area
  • Above 1.5 m: authorised-person certification
  • Waterproof the roof before installing panels
Rooftop solar panels on a village house (design rendering) | HK Create Design
Design illustration: Solar panels on a village house roof. The final design follows the site measurements and design drawings. HK Create Design. Select an image to enlarge

05

How the Buildings Department enforces the rules

The Buildings Department takes immediate action against works presenting an obvious threat or imminent danger, and against works in progress or newly erected. Anything erected on or after 28 June 2011 is treated as new[3]. A new unauthorised village-house extension is therefore subject to immediate enforcement.

For existing works without immediate danger, the Buildings Department targets more serious, higher-risk cases first through village-by-village enforcement[3]. First-round targets include houses of four or more storeys, a three-storey house with one or more added floors, and enclosed roof structures exceeding 50% of the main building's roofed-over area[3].

Avoid major fit-out spending in an unauthorised structure. An expensive rooftop room may later have to be removed.

  • Immediate enforcement against dangerous or newly erected works
  • Works erected on or after 28 June 2011 are treated as new
  • First round includes four or more storeys or an enclosed roof structure covering over 50%
  • Avoid costly fit-outs in unauthorised structures
Maximum projection beyond an external wall for common exempt facilities(Unit:mm)
Air-conditioner brackets
750mm
Canopy
750mm
Ground-floor shop sign
600mm
Window grille
500mm
Electricity meter cabinet
380mm
Roller shutter
300mm

Based on Buildings Department information. [2]

HK Create Design・Work sequenceReporting scheme process
  1. Appoint qualified personnelCheck for unauthorised works
  2. Submit onlineDeclaration and safety certification report
  3. Pay the feeHK$600
  4. Every five yearsRepeat inspection
Rendering and plastering on site | HK Create Design
Site photo of masonry work | HK Create Design Select an image to enlarge

06

The 2026 unauthorised works reporting scheme

The Buildings Department reopened the reporting scheme for unauthorised works in New Territories Exempted Houses for one year, from 1 April 2026 to 31 March 2027[4][3]. The scheme covers eligible pre-existing works of lower risk or less serious contravention. First-round enforcement targets are excluded[3].

The 11 categories include balconies enclosed with steel, aluminium, metal sheet or glass, enclosed roof structures no larger than half the main building's roofed-over area, unenclosed steel or aluminium roof structures, ground-floor extensions adjoining the main building, balcony dividing walls over 150 mm thick, canopies, supported ground-floor canopies, metal AC racks and lightweight hoods, and three types of signboard[4].

The owner makes a declaration and appoints qualified personnel to inspect and submit a safety certification report. Submission is electronic only through the Buildings Department system. The HK$600 fee is paid by FPS[4]. Thereafter, arrange a further inspection and safety report every five years. Failure to comply can cancel the reporting status[4].

Owners who reported in 2012 do not need to report the same works again, but must continue the five-year inspections[4]. Unreported works are subject to progressive enforcement[3].

  • Reporting period: 1 April 2026 to 31 March 2027
  • 11 categories of less serious unauthorised works
  • HK$600 administrative fee; online submission only
  • Arrange repeat inspection every five years
Site photo of a completed bathroom renovation | HK Create Design
Site photo of a bathroom renovation | HK Create Design Select an image to enlarge

07

What to check before buying a village house

Land grants or building licences under the Small House Policy commonly restrict transfer. Restrictions may survive completion and a land premium may be payable to lift them[5]. Buyers should check the lease or grant to see whether restrictions still apply[5].

The Lands Department advises buyers to compare the house with the lease or building licence, including area, height, storeys, approvals and exemption certificates[5]. On completion, look for the Certificate of Compliance or a No Objection to Occupy letter, as applicable[5].

Title and property checks are matters for solicitors and surveyors. Once title and structural issues are resolved, we can plan the interior and estimate the budget. At the viewing stage, send photos by WhatsApp for a preliminary renovation estimate.

  • Small Houses may carry restrictions on transfer
  • Compare area, height and storeys with the lease
  • Check the completion documents
  • Solicitors check title; we estimate refurbishment
Worked example 1

Example: waterproofing a village house roof before installing solar panels

Assumptions

  • 700 sq ft roof
  • Ageing roof waterproofing
  • Then install solar panels in a continuous array

How to calculate quantities

  1. C01 waterproofing: 700 × HK$39 = HK$27,300
  2. Continuous cover is limited to half the roofed-over area, about 350 sq ft in this example
  3. Main-roof system no more than 1.5 m high including supports: the height-triggered authorised-person certificate does not apply
  4. Waterproof before installing the panels to avoid removing them later

The roof waterproofing example is about HK$27,300. A specialist supplier quotes separately for the solar system.

Solar installation is outside HK Create Design's listed rates. Check the latest official conditions. [7][2]

Use your square footage instead and see a reference budget

08

Typical non-structural interior work

Painting, filling and moisture-resistant treatment need no structural change. In damp village houses, our E01 strip-back, fill, moisture treatment, sand and repaint specification is HK$39/sq ft[7].

SPC, laminate or tile flooring can be laid without structural alterations. J01 SPC is HK$60/sq ft with a 200 sq ft minimum. D01 floor tiling is HK$78/sq ft[7].

Kitchen and bathroom refurbishment includes cabinets, tiles, fixtures and waterproofing. The Buildings Department identifies pipework and defective bathroom membranes among common sources of seepage[9]. A village-house bathroom may sit above the family's living room, so detail the waterproofing carefully. C02 Bathroom waterproofing HK$4,850 including a 24-hour flood test[7].

Custom furniture: wardrobes,Platform beds, TV units and tall cabinets are internal fittings. ENF-grade boards are standard in HK Create Design's custom furniture.

  • E01 moisture treatment and repainting: HK$39/sq ft
  • Flooring: SPC at HK$60/sq ft
  • Kitchens and bathrooms: allow for waterproofing
  • Custom furniture: ENF-grade boards as standard
HK Create Design・Illustrated comparisonWhat you can do and what needs checking first
  1. Ordinary non-structural workPainting, flooring, kitchen, bathroom and furniture
  2. Clarify the details firstRemoving walls, opening windows, enclosing balconies and adding extensions
Made-to-measure kitchen cabinets and wall units | HK Create Design
Project photo of bespoke kitchen cabinets | HK Create Design Select an image to enlarge
Renovated village house interior (design rendering) | HK Create Design
Design illustration: Refurbished village house interior. The final design follows the site measurements and design drawings. HK Create Design. Select an image to enlarge

09

Work to establish before proceeding

Older brick village houses may rely on walls for support. Ask a registered structural engineer or authorised person to assess before demolition. A04 non-structural brick wall removal is HK$69/sq ft and requires confirmation that the wall is non-structural[7].

New or enlarged windows alter the external wall and can affect structure and appearance. A balcony enclosed with glass and aluminium is a category of unauthorised works under the reporting scheme where historic eligibility conditions apply[4], so this goes beyond an ordinary internal renovation.

Assess any covered rooftop addition. An enclosed roof structure covering over 50% of the main building's roofed-over area is a first-round enforcement target[3]. An unauthorised ground-floor extension outside the main building is one of the listed types of works[4].

Check with the Buildings or Lands Department or the appropriate professional before designing these works. Confirming feasibility first can avoid spending on work that must later be removed.

  • Verify a wall is non-load-bearing before removal
  • Check proposals for window openings and balcony enclosures
  • Roof structures and ground-floor extensions can be unauthorised works
  • Resolve the approvals before design
Guide to renovation work categories

You can swipe left or right on your phone to view the complete table.

CategoryExampleHow to address itrisk
Interior refurbishmentPainting, flooring, kitchen, bathroom and furnitureUsually straightforwardLow
Structural proposalsRemoving walls and making window openingsObtain a professional assessment firstMedium to high
Changes to the exteriorBalcony enclosures and added canopiesCheck the amenity conditions or reporting categoryMedium
ExtensionsRooftop rooms and ground-floor extensionsCheck first with the Buildings and Lands DepartmentsHigh
Building servicesDistribution board, circuits and gasBy the appropriate registered contractorDepends on the installation

Prepared by HK Create Design for general information. Obtain legal advice on individual cases. [1][4][3]

10

Electrical and gas requirements still apply

The village-house exemption covers specified buildings requirements. Fixed electrical work is still subject to the Electricity Ordinance and requires a registered electrical contractor and registered electrical worker[8].

Many older houses still have fuse boxes without residual-current protection. H09 replacesDistribution board replacement HK$6,800 for replacement with MCB and RCD protection[7]. H06 new dedicated electrical circuit: HK$3,350 per circuit, for appliances such as a water heater or induction hob[7].

Many village houses use LPG. A qualifying ground-floor cylinder enclosure may be up to 1.2 m high, 1 m wide and project 0.4 m[2]. Have a registered gas contractor handle gas pipework and appliance installation.

A ground-floor meter box within 1.2 × 1.6 m and projecting no more than 0.38 m can qualify as an amenity facility[2]. Check the position and dimensions when replacing the meter enclosure or increasing supply capacity.

  • Electrical work by a registered electrical contractor
  • Replace fuse box with MCB/RCD distribution board: HK$6,800
  • LPG cylinder box: up to 1.2 m high × 1 m wide
  • Gas work by a registered gas contractor

11

Adjoining village houses and their neighbours

Adjoining village houses can share walls or roof boundaries. The Buildings Department lists a balcony dividing wall up to 150 mm thick between adjoining houses as a qualifying amenity facility[2]. A thicker wall falls within a reporting-scheme category if the other eligibility conditions are met[4].

A solid dividing parapet between adjoining roofs may be no more than 150 mm thick and 1.22 m high. Qualifying mesh fences or railings may be up to 2.5 m high[2].

Breaking out on a shared wall causes vibration and noise, so notify neighbours early. On adjoining roofs, detail the junction carefully to prevent water passing across it. Our team gives particular attention to these boundaries and pipe penetrations.

  • Balcony dividing wall: maximum 150 mm thick for exemption
  • Roof dividing parapet: up to 150 mm thick and 1.22 m high
  • Notify neighbours before breaking out at a shared wall
  • Reinforce waterproofing where adjoining roofs meet

12

Ten checks before renovation

1. Establish whether the house holds a valid exemption or was built before 1961[1]. 2. Check for extensions or unauthorised works and establish whether the reporting scheme applies[4]. 3. Check that the proposals stay within the floor, height and roofed-over area limits[1].

4. Verify the wall is non-load-bearing before removal. 5. Check the conditions for AC brackets, grilles and shutters[2]. 6. Engage a registered electrical contractor for electrical work[8]. 7. Engage a registered gas contractor for gas work.

8. For the top floor, inspect the roof waterproofing. 9. Trace the source of any seepage[9]. 10. Itemise work, carrying, waste disposal and warranty in the quotation.

Use the list to identify questions before renovating. Consult the Buildings or Lands Department, a solicitor or an authorised person about the specific legal position.

  • Exemption status
  • Any unauthorised works?
  • Within the limits
  • Load-bearing wall
  • Size limits for qualifying facilities
  • Electricity and gas
  • Roof waterproofing
  • Source of seepage
  • Clear written quotation
Worked example 2

Example: planning interior renovation alongside the reporting scheme

Assumptions

  • Aluminium windows enclose the third-storey balcony
  • A full interior renovation is planned

How to calculate quantities

  1. A pre-existing balcony enclosure may be reportable if it meets the scheme's eligibility rules. [4]
  2. Limit the balcony to basic paintwork pending checks and keep costly fitted furniture elsewhere
  3. Proceed with ordinary internal refurbishment elsewhere
  4. Inspect every five years after reporting

Concentrate major spending on compliant space to limit losses if removal is required later.

Reporting does not legalise the works. The Buildings Department may take enforcement action later. [4][3]

Use your square footage instead and see a reference budget
Village house renovation rules: checklist illustrated | HK Create Design
Village house renovation rules: checklist | HK Create Design Select an image to enlarge

13

What to discuss with the contractor

1. Explain any additions, reported unauthorised structures and original walls. A renovation contractor cannot determine title or certify a structure, but accurate information helps price the work and keep large spending away from disputed areas.

2. Explain future plans: redevelopment in a few years, renting the property out orOlder residentssharing the home. A temporary pre-redevelopment refurbishment can prioritise essentials. For older residents, allow for handrails, slip-resistant tiles and wider doorways.

3. Describe access: how close a van can park, whether there are stairs and how wide they are. This affects furniture sizes and delivery trips. FUR42 delivery is HK$660 per trip and FUR43 stair carry without a lift is HK$300 per floor[7]. Confirming access before quotation avoids unexpected carrying charges.

4. Agree working hours. Many neighbours are older residents. Schedule noisy work during permitted daytime hours and give neighbours advance notice.

  • Explain the existing condition and additions
  • Discuss the future use
  • Describe the access for carrying materials
  • Agree working hours

14

Village-house interior refurbishment with HK Create Design

HK Create Design has served Hong Kong households since 2019. Our team includes designers and tradespeople with over 15 years' experience. We specialise in interiors and custom furniture and publish our rates online[7].

Through 31 December 2026, we offer free site measurement for two or more work items. We note visible additions and possible load-bearing walls and flag proposals needing professional assessment. We provide a one-year workmanship warranty and a HK$2,000 minimum charge.

Showroom: Shop 16, G/F, Fu Yau Building, 61 Po Kong Village Road, Wong Tai Sin, Kowloon. WhatsApp photos or a floor plan to 5243 7747 for a preliminary assessment.

  • Interior renovation and custom furniture
  • Prices published online
  • Free site measurement for a limited time
  • WhatsApp 5243 7747

Advice from our tradespeople

「Owners often ask about enclosing a balcony. We explain that a qualifying historic enclosure can fall under the reporting scheme, while a new enclosure is a different matter, before agreeing how to allocate the budget.」

Project supervisor, HK Create DesignHK Create Design project team

「For village-house storage, we usually start with fitted furniture inside the original footprint. This makes use of existing space without depending on an extension.」

Head of Design, HK Create DesignHK Create Design team

FAQ

8 practical questions answered

01Do I need to apply to the Buildings Department to renovate a village house?

Ordinary interior work in a validly exempt house generally needs no prior Buildings Department approval. An addition exceeding the storey, height or roofed-over area limits can invalidate the exemption[1].

02Can an air-conditioner bracket be installed on a village house?

Yes, subject to an anti-drip design, projection no more than 750 mm from the external wall, and no projection from a balcony or canopy[2].

03How far can village house window grilles project?

External cage grilles may project up to 500 mm. A section over an accessible pavement with less than 2.5 m clear headroom is limited to 150 mm[2].

04Can solar panels be installed on the roof?

On the main roof, subject to a maximum 2.5 m height including supports, average loading up to 150 kg/m² and the other scheme conditions. Above 1.5 m, an authorised person must certify the system[2].

05How much does it cost to report unauthorised building works?

HK$600 by FPS. Appoint qualified personnel for inspection and online safety certification[4].

06Does enclosing a balcony count as unauthorised building work?

A balcony enclosed in steel, aluminium, metal sheeting or glass is one of the 11 reporting categories, subject to the age and other eligibility conditions[4].

07How are village houses built before 1961 treated?

Buildings completed before 1 January 1961 and never subsequently altered, extended or rebuilt fall outside this definition of unauthorised works[1].

08What should I check when buying a village house?

Ask a solicitor to check alienation restrictions, land premium, floor count, height, roofed-over area and the approval and completion documents[5].

CHECK THE BASIS

Data and technical basis, sources can be verified

  1. [1]Buildings Department: New Territories Exempted Houses Accessed: 2026-11-03
  2. [2]Buildings Department, Green and Amenity Facilities in New Territories Exempted Houses Accessed: 2026-11-03
  3. [3]Buildings Department: Enforcement against unauthorised works in New Territories Exempted Houses Accessed: 2026-11-03
  4. [4]Buildings Department: Guide to the relaunched reporting scheme for unauthorised works in New Territories Exempted Houses Accessed: 2026-11-03
  5. [5]Lands Department: Buying a New Territories Village House Accessed: 2026-11-03
  6. [6]Lands Department: New Territories Village Houses Accessed: 2026-11-03
  7. [7]HK Create Design published 2026 rates and work item descriptions Accessed: 2026-11-03
  8. [8]Electrical and Mechanical Services Department: Household Electrical Safety Handbook, new installations, additions and alterations Accessed: 2026-11-03
  9. [9]Buildings Department: water seepage FAQs Accessed: 2026-11-03