01
Why village-house budgets differ from private-flat budgets
Private flats are usually described by saleable area. A village house may have a much larger footprint: the Buildings Department gives up to 65.03 m² of roofed-over area for a qualifying New Territories Exempted House[2], or around 700 sq ft. Across three storeys, the total can exceed 2,000 sq ft. The same rates therefore apply to a larger measured scope.
2. Exposure. Two or three elevations of a village house may face rain and sun, with no regular estate façade maintenance. Hong Kong Observatory's 1991–2020 normals put annual mean relative humidity at about 78% and annual rainfall at 2,431 mm[5]. High humidity and weathered external walls can contribute to mould and peeling on internal walls and ceilings.
3. Logistics. A truck may be unable to park at the door. Materials must be carried in and upstairs and waste back to the vehicle. This can add labour and time.
Check moisture treatment, waterproofing, carrying, pipework and electrical capacity separately. A private-flat price multiplied by floor area can miss these village-house costs.
- Around 700 sq ft on each floor
- High humidity and rain-exposed façades
- Long carrying route without lift access
- Estimate each item for the village house

02
Establish what the village house can accommodate
Interior painting, flooring, cabinet replacement, sanitaryware andBespoke furniture, are generally internal, non-structural works. Check requirements first for wall removal, new windows, extensions or alterations to stairs. The Lands Department handles matters such as land grant conditions[3]. The Buildings Department handles building requirements and enforcement against unauthorised works in exempt houses[2].
The Buildings Department's relaunched New Territories Exempted House reporting scheme runs from 1 April 2026 to 31 March 2027[4]. Check any rooftop structure or balcony addition before renovating, so the budget avoids works that may have to be removed.
During measurement, we note visible additions and walls that may be load-bearing. Where structure or land grant conditions are involved, we ask the owner to confirm the position with the relevant department or professional before design.
- Interior refurbishment generally avoids structural alterations
- Check requirements for wall removal, new openings and extensions
- Unauthorised works reporting deadline: 31 March 2027
- Avoid costly fit-outs in unauthorised structures
You can swipe left or right on your phone to view the complete table.
| Item | village house | Private flats | Indicative prices |
|---|---|---|---|
| Painting | Often needs stripping and moisture treatment | Sound walls can be repainted directly | E01 HK$39 / E03 HK$12 |
| Roof waterproofing | Include in a top-floor budget | Generally unnecessary | C01: HK$39 per sq ft |
| Transport and handling | Stair carry | Direct lift access | FUR43: HK$300 per floor |
| Construction rubble | May require a manual carry from the delivery point | Location designated by management | A11: HK$4,200 per truckload |
| pipework | Old galvanised pipes are common | Depends on the building's age | G05 HK$22,300 |
| Area | About 700 sq ft per floor | Generally 300–600 sq ft | Price from the actual measured area |
Based on HK Create Design's published 2026 rates. [1]
- Moisture resistanceStripping back wall finishes.
- RooftopAllow for this on the top floor.
- Transport and handlingstair carrying charges.
- pipeworkReplacing old pipes.
- electricityReplace the distribution board.
- RequirementsCheck the position first.

03
Light refurbishment of one 700 sq ft village-house floor
The light example suits a house with mostly sound walls, no obvious leaks and a usable kitchen and bathroom. On a 700 sq ft floor, around 1,800 sq ft of walls at the E03 rate of HK$12/sq ft comes to HK$21,600[1].
Around 600 sq ft of living room and bedrooms at the J01 SPC rate of HK$60/sq ft comes to HK$36,000[1]. SPC resists water, but an underlying damp problem still needs treatment before new flooring is laid.
Add E05 mould treatment and repainting on four wall faces HK$5,000, H01 electrical inspection HK$770, D08 epoxy grouting on 120 sq ft of bathroom tiles HK$2,520, K03 shower mixer replacement HK$970 and finally L01 Post-renovation cleaningand formaldehyde treatment for 700 sq ft at HK$11,200[1]. The example totals about HK$78,060.
A light refurbishment usually takes two to three weeks. If the existing coating is peeling or mould-damaged, repainting alone can fail within months. Check the walls at the survey.
- Repaint 1,800 sq ft: HK$21,600
- 600 sq ft of SPC: HK$36,000
- Light refurbishment example: about HK$78,060
- Prepare unsound walls before repainting
- $78,060MildRepaint and renew flooring
- $285,450ComprehensiveExcludes the roof
- $312,750Full top-floor renovationIncluding roof waterproofing
Examples based on HK Create Design's published 2026 rates.
「Before quoting for a village house, we scrape-test the walls and inspect the rooftop waterproofing. These two checks can make the difference between an HK$80,000 and an HK$300,000 budget.」

04
Full renovation of one 700 sq ft village-house floor
A full renovation suits an older house with damp walls, worn kitchen or bathroom, orageing electrical wiringageing services. For the walls, 1,800 sq ft × HK$39 for E01 strip-back, filling, moisture treatment, sanding and repainting = HK$70,200[1]. This can be one of the largest differences between village-house and private-flat budgets.
600 sq ft of SPC HK$36,000 and 250 linear ft of J04 skirting HK$2,500. Complete bathroom example HK$55,540 for strip-out, waterproofing, tiling, plumbing, fixtures, vanity and screen. Complete eight-foot kitchen example HK$74,240[1].
Electrical allowance: H01 inspection HK$770 and H09 replacementDistribution board replacement HK$6,800, ten H02 sockets HK$6,400 and two H06 dedicated circuits for a heater and induction hob HK$6,700. With inspection, total HK$20,670[1].
Finally add two A11 waste loads HK$8,400, L02 third-party and employees' compensation insurance HK$6,700, and L01 cleaning and formaldehyde treatment HK$11,200[1]. The total is about HK$285,450, or HK$408/sq ft. Adding HK$27,300 for top-floor roof waterproofing brings the example to HK$312,750.
- E01 moisture treatment and repainting: HK$70,200
- Kitchen and bathroom combined: HK$129,780
- Electrical work: HK$20,670
- Full renovation example: about HK$285,450
- Roof waterproofingStop the leak first
- Check after heavy rainConfirm there is no seepage
- Ceilings and wallsMoisture-resistant paint
- Flooring and furnitureInstall last
05
Roof waterproofing in a top-floor budget
A roof exposed to sun and heavy rain can leak through an aged membrane into the top-floor ceiling. The Buildings Department identifies pipework, bathroom membranes, roofs and external walls as common seepage sources[6]. Check the roof before refurbishing a top floor.
C01 uses SikaTop Seal-107 at HK$39/sq ft. It includes cleaning and dampening the base, reinforcement at internal corners and pipe penetrations, and two coats applied crosswise[1]. At 700 sq ft the roof treatment comes to HK$27,300. An optional third coat adds HK$10/sq ft.
Remove loose roof tiles or blistered old waterproofing before renewal. A01 tile removal is HK$30/sq ft[1]. Roof treatment needs suitable dry weather. Allow flexibility for rain.
Waterproof first, check after heavy rain and refurbish the top-floor ceiling and walls once dry. Otherwise damp stains can recur on the new finish.
- Check the roof before renovating the top floor
- C01 at HK$39/sq ft: about HK$27,300 for 700 sq ft
- Remove blistered old layers first
- Waterproof, verify after heavy rain, then repaint
- E01 strip-back and moisture treatmentHK$39/sq ft for damp-affected walls
- E03 Turn oil directlyHK$12/sq ft for sound walls


06
Moisture treatment and repainting: E01 or E03?
E03 repainting costs HK$12/sq ft, against HK$39/sq ft for E01 strip-back and moisture treatment. The lower price depends on the existing coating being sound[1]. Years of damp can loosen paint and plaster. Coating this unsound base can lead to blistering and peeling within months.
E01 strips old paint to the substrate, applies a moisture-resistant primer, adds two or three skim coats, sands and finishes with two or three coats of Nippon Paint or Dulux as specified[1]. The longer preparation can provide a more durable finish.
Between them, E02 at HK$21/sq ft covers local filling, moisture treatment, sanding and repainting for generally sound walls with isolated cracks[1]. Specifications can vary by wall. Use E01 on affected internal faces of exterior walls and E02 or E03 on sound internal walls to limit costs.
Lightly test a representative area. A powdery or easily detached finish points towards E01 preparation. A sound wall with an old colour or minor marks may suit E03.
- E03 HK$12/sq ft: walls in sound condition
- E02 HK$21/sq ft: local cracking
- E01 HK$39/sq ft: peeling, mould-affected or damp walls
- Use E01 on damp-affected perimeter walls and E02/E03 on sound interior walls
Example: light refurbishment of one 700 sq ft village house floor
Assumptions
- Walls generally sound
- Serviceable kitchen and bathroom
- SPC in living room and two bedrooms
How to calculate quantities
- E03:1,800 × HK$12 = HK$21,600
- J01:600 × HK$60 = HK$36,000
- E05:4 × HK$1,250 = HK$5,000;H01:HK$770
- D08:120 × HK$21 = HK$2,520;K03:HK$970
- L01:700 × HK$16 = HK$11,200
- Total: HK$78,060
Illustrative total about HK$78,060, with a programme of around two to three weeks.
Peeling or mould-affected walls may need E01. Confirm the specification after measurement. [1]

07
Carrying and debris: village-house costs to allow for
Village houses often require stair carrying. FUR42 custom-furniture delivery is HK$660 per trip plus FUR43 at HK$300 per floor without a lift[1]. The example for carrying furniture to the third level adds HK$900 per trip.
A11 debris removal is HK$4,200 per truckload, including carrying down, transport and lawful disposal[1]. A full renovation of one floor may generate about two loads. A long manual carry where the truck cannot reach the door can add cost.
The Environmental Protection Department encourages retaining serviceable materials during renovation to reduce waste[10]. Reusing sound timber doors and metal gates saves disposal costs and reduces waste.
Confirm whether carrying is included, how stairs are charged and how many disposal loads are allowed. The Consumer Council recommends specifying the scope, quantities and payment terms[9]. Writing those details down helps avoid disputes at completion.
- Delivery HK$660/trip plus stairs HK$300/floor
- Debris removal, HK$4,200 per truckload
- Keep serviceable existing materials
- Itemise carrying and debris disposal
08
Kitchen and bathroom renovations: inspect village-house pipes
Original galvanised pipes can corrode, restrict pressure or leak over time. G05 supply and waste renewal for the kitchen and bathroom is HK$22,300 in a full renovation[1].
To check a suspect pipe first, G01 opening-up inspection is HK$930. The contractor opens the specified position and supplies photographs before a replacement decision[1].
Bathroom waterproofing C02 bathroom waterproofing is HK$4,850 with a 24-hour flood test. C03 kitchen waterproofing is HK$4,300[1]. The room below a village-house bathroom may be another home's space or your own living room. A failed membrane can damage either.
For a bathroom above 40 sq ft, the example charges additional waterproofing area at the C01 rate of HK$39/sq ft[1]. Measure the actual area during the survey to avoid a discrepancy in the quotation.
- Example replacement of old galvanised runs: HK$22,300
- Investigate first: G01 HK$930
- Bathroom waterproofing HK$4,850 including the pond test
- Extra waterproofing for bathroom areas above 40 sq ft
You can swipe left or right on your phone to view the complete table.
| Item | Quantity | Unit price | Subtotal |
|---|---|---|---|
| E01 moisture treatment and repainting | 1,800 sq ft | HK$39 | HK$70,200 |
| J01 SPC floor | 600 sq ft | HK$60 | HK$36,000 |
| J04 Install skirting boards | 250 linear ft | HK$10 | HK$2,500 |
| Full bathroom renovation | 1 rooms | Example | HK$55,540 |
| Full renovation of an eight-foot kitchen | 1 rooms | Example | HK$74,240 |
| Electrical inspection, board, sockets and circuits | 1 set | Example | HK$20,670 |
| A11 Rubble removal | 2 truckloads | HK$4,200 | HK$8,400 |
| L02 insurance | 1 job | HK$6,700 | HK$6,700 |
| L01 cleaning and formaldehyde treatment | 700 sq ft | HK$16 | HK$11,200 |
| Total | — | — | HK$285,450 |
Roof waterproofing and custom furniture are extra. Confirm the written quotation after measurement. [1]

09
Electrical work: assessing the old distribution board
Many older houses retain fuse boxes without modern residual-current protection. EMSD advises regular inspection and the use of registered electrical contractors and workers[7].
H09 distribution board replacement: HK$6,800 to replace an old fuse box with MCB/RCD protection and label the circuits[1]. Running air conditioners, a water heater and a dehumidifier together can exceed the capacity of an older installation.
Allow H06 at HK$3,350 per dedicated circuit where the electrical design calls for one for a water heater, induction hob or oven[1]. If the total demand exceeds the incoming supply, apply to the electricity utility for a capacity increase. This is separate work.
Consider a conveniently located socket in each room for a dehumidifier. H02 is HK$640 per new 13 A single socket[1]. Adding properly planned sockets during renovation can avoid reliance on trailing extension leads later.
- Replace fuse box with MCB/RCD distribution board: HK$6,800
- Dedicated circuit: HK$3,350 each
- Allow a socket for a dehumidifier in each room
- Electrical work by a registered electrical contractor
10
Estimating a full three-storey village house
For three floors, start with the single-floor example and adjust the scope of each. A ground-floor living room and kitchen cost differently from bedrooms and bathrooms upstairs, so a simple multiplication is misleading.
Illustrative allowance by floor: ground-floor living/dining room, kitchen and bathroom HK$280,000–300,000; three bedrooms and a bathroom on the next floor HK$200,000–230,000; a similar top floor HK$200,000–230,000 plus around HK$27,000 for the roof. A rough whole-house range is HK$700,000–800,000, depending on bathrooms and fitted furniture.
Combining all three floors can consolidate disposal, transport and insurance and keep trades on site. Allow a longer single programme, often around two to three months.
With a limited budget, phase the roof and top floor first, followed by the kitchen/bathroom level and remaining rooms. Complete concealed services and wet trades before finishes.
- Price each floor separately
- Roughly HK$700,000 to HK$800,000
- Doing floors together can consolidate disposal, delivery and insurance
- Phasing: roof and top floor first
11
Custom furniture for a larger village-house interior
High ceilings and generous rooms can accommodate a full-height TV and storage wall, or a bedroomPlatform bedsIncludes the wardrobe and under-stair storage cabinets. HK Create Design's custom furniture service includes design and full drawings for the flat: floor plans, ventilation, fire services, plumbing and electrical layouts, furniture designs, VR visualisations and production drawings.
Published examples: FUR05 wardrobes HK$2,900/linear ft, FUR06 platform beds HK$340/sq ft, FUR10 low TV cabinets HK$1,250/linear ft and FUR01 tall cabinets HK$2,900/linear ft[1]. For a full-height cabinet, FUR04 adds HK$100 per additional 100 mm above the standard height.
We specify ENF-grade boards with formaldehyde emissions at or below 0.025 mg/m³ under the applicable test. For cabinets backing onto exterior walls, allow clearance or moisture protection to reduce mould risk.
EPD notes that new furniture and paint can emit volatile organic compounds. Ventilate after completion[8]. Where the outdoor conditions permit, continue ventilating after handover. The example allows one or two weeks.
- Whole-house drawings: layouts, building services, VR renders and production drawings
- Wardrobe HK$2,900/linear ft; platform bed HK$340/sq ft
- ENF-grade boards as standard
- Protect cabinet backs beside external walls

12
Five common village-house budget overruns
1. Hidden poor wall condition. Stripping the paint can reveal loose plaster, changing the specification from E03 at HK$12/sq ft to E01 at HK$39/sq ft[1]. Test a few areas during the site survey to assess the substrate before pricing.
2. Roof or façade leaks discovered from a ceiling stain can add waterproofing. 3. Corroded kitchen or bathroom pipes discovered during strip-out can add repiping.
4. Poor vehicle access and narrow stairs add carrying and waste costs. 5. Additional air conditioners or water heaters may need circuits or an incoming supply upgrade.
Consider retaining around 20% of the budget as a planning contingency. The owner keeps this reserve and spends it only if necessary.
- Walls worse than expected
- Roof or façade leaks
- Ageing pipes
- Carrying access and electrical capacity
- Allow a contingency of 20% of the works budget
Example: full renovation of a top-floor 700 sq ft village house flat
Assumptions
- Damp-affected walls
- Worn kitchen and bathroom
- Top floor beneath the roof
How to calculate quantities
- E01:1,800 × HK$39 = HK$70,200
- J01+J04:HK$36,000 + HK$2,500 = HK$38,500
- Bathroom HK$55,540 + kitchen HK$74,240 = HK$129,780
- Electrical: 770 + 6,800 + 6,400 + 6,700 = HK$20,670
- A11 HK$8,400+L02 HK$6,700+L01 HK$11,200 = HK$26,300
- Subtotal HK$285,450. Roof C01: 700 × HK$39 = HK$27,300
- Total: HK$312,750
Example total of about HK$312,750.
Custom furniture is extra. Unusual carrying routes and upgrades to the incoming electricity supply are priced separately. [1]

13
Ground moisture and external walls
Ground-floor slabs can be vulnerable to damp after humid spells or heavy rain, leaving wet flooring or dark grout. Investigate persistent damp before covering the slab. An example for a suitable base uses B02 screed at HK$22/sq ft and C01 waterproofing at HK$39/sq ft before SPC or tiles[1].
Ground-floor kitchens, bathrooms and living areas can need more moisture protection than upstairs rooms. Water-resistant SPC still leaves underlay and trims exposed to moisture from below. Consider tiles in persistently damp-prone areas. D01 floor tiling is HK$78/sq ft[1].
Village-house owners generally arrange their own façade repairs. Rain can penetrate external cracks and undermine interior paint. The Buildings Department advises tracing the source of seepage[6]. External façade repair involving scaffolding or work at height requires a separate assessment and quotation.
One staged approach is to repair roof and façade leaks, monitor the repair through wet weather and then repaint indoors. For an early move, repair the source first and use E02 as an interim finish with local repainting later if necessary. During humid spells, dehumidify and let surfaces dry before painting. On wet days, schedule suitable indoor jobs. At measurement we check damp in the floor and walls before recommending waterproofing.
- Address damp and levels before laying the ground-floor finish
- Consider tile for a damp-prone ground floor
- Repair external cracks first
- Check damp during measurement
14
A village-house renovation with HK Create Design
HK Create Design has served Hong Kong households since 2019. Our designers work with tradespeople with over 15 years' experience, including numerous New Territories village-house renovations. Our rates are published online[1]. Use the online estimator for an initial budget, then book a survey.
Through 31 December 2026, site measurement is free for two or more work items. We check the walls, roof, pipes and distribution board to identify work needing early attention and items that can be phased.
We provide a one-year workmanship warranty and a HK$2,000 minimum charge. Visit Shop 16, G/F, Fu Yau Building, 61 Po Kong Village Road, Wong Tai Sin, Kowloon. WhatsApp 5243 7747 with plans or photos of the roof, distribution board and kitchen or bathroom pipes for an initial estimate.
- Serving customers since 2019
- Prices published online
- Limited-time free site measurement for two or more work items
- WhatsApp 5243 7747
Advice from our tradespeople
「Before quoting for a village house, we scrape-test the walls and inspect the rooftop waterproofing. These two checks can make the difference between an HK$80,000 and an HK$300,000 budget.」
「After roof waterproofing, check the repair after heavy rain before repainting the top-floor ceiling.」
FAQ
10 practical questions answered
01How much does renovating a 700 sq ft village house cost?
Light example: repainting, SPC, mould treatment and cleaning, about HK$78,060. Full example: damp treatment and painting, kitchen, bathroom, electrical work, floor, disposal and insurance, about HK$285,450[1].
02What does village house roof waterproofing cost?
C01 SikaTop Seal-107: HK$39/sq ft, about HK$27,300 for a 700 sq ft roof. A third coat adds HK$10/sq ft[1].
03Why can painting a village house cost more than painting a private flat?
Damp, unsound village-house walls may need E01 preparation at HK$39/sq ft. A sound private-flat wall may suit E03 repainting at HK$12/sq ft[1][5].
04How is carrying charged in a village house without a lift?
Custom-furniture delivery HK$660/trip, stair carry HK$300/floor, debris HK$4,200/truckload[1].
05Can I remove a wall in a village house myself?
Confirm a wall is non-load-bearing before removal. Check Buildings and Lands Department requirements where the structure or land grant is involved[2][3].
06Can a village house with unauthorised works be renovated?
The reporting period is 1 April 2026 to 31 March 2027. Check the status of any unauthorised works before investing in their fit-out[4].
07How much does it cost to renovate all three storeys?
Depending on the number of kitchens and bathrooms and the furniture, allow roughly HK$700,000–800,000. Confirm by measurement and written quote.
08What should I do about damp rising through a village house ground floor?
Assess the damp first. An example system allows B02 levelling at HK$22/sq ft and C01 waterproofing at HK$39/sq ft before SPC or tiles. Consider tile on a damp-prone ground floor[1].
09Am I responsible for maintaining the external walls of a village house?
Village houses usually lack a shared façade fund. Owners arrange repairs. If cracks admit rain, fix the source before redecorating[6]. Assess scaffold access separately.
10How long does renovating a village house take?
Allow about two to three weeks for light refurbishment of one floor, one and a half to two months for full renovation of one floor, or two to three months for the whole three-storey house.
CHECK THE BASIS
Data and technical basis, sources can be verified
- [1]HK Create Design published 2026 rates and work item descriptions Accessed: 2026-11-03
- [2]Buildings Department: New Territories Exempted Houses Accessed: 2026-11-03
- [3]Lands Department: New Territories Village Houses Accessed: 2026-11-03
- [4]Buildings Department: Guide to the relaunched reporting scheme for unauthorised works in New Territories Exempted Houses Accessed: 2026-11-03
- [5]Hong Kong Observatory climatological normals, 1991–2020 Accessed: 2026-11-03
- [6]Buildings Department: water seepage FAQs Accessed: 2026-11-03
- [7]Electrical and Mechanical Services Department: Household Electrical Safety Handbook, new installations, additions and alterations Accessed: 2026-11-03
- [8]Environmental Protection Department: Indoor Air Quality Information Centre FAQs Accessed: 2026-11-03
- [9]Consumer Council: Renovation quotations should be detailed and teach you one by one in 12 major areas Accessed: 2026-11-03
- [10]Hong Kong GovHK: Environmentally Friendly Tips for Home Renovation Accessed: 2026-11-03