Should an older flat be repainted or stripped first?
Start by checking whether the old paint is sound. If it is merely aged or marked, direct repainting is sufficient. Our E03 rate is HK$12 per sq ft, with a minimum charge of HK$3,700[1]. For local peeling and cracks, E02 filler repairs cost HK$21 per sq ft[1]. If paint is widely peeling, mouldy or excessively thick, strip back to the plaster and rebuild the finish under E01 at HK$39 per sq ft[1].
Many older flats have accumulated layers of paint over decades of repainting. Nippon Paint’s technical guidance calls for removal of loose or unsound paint film and a clean, dry substrate[11]. Fresh paint can pull a weak old coating away, causing both to peel within months.
HK Create Design handlesOlder flat renovation, we assess each room separately to determine what needs stripping or repainting. For the overall budget, see our older flat renovation cost guide. This article covers painting.
- Repaint where the surface is sound
- Repair isolated loose areas
- Strip back widespread peeling paint
02
Four simple preliminary checks for homeowners
First, scrape an inconspicuous spot lightly with a fingernail or plastic card. Paint that comes away easily has poor adhesion. Second, press tape firmly onto the wall and peel it off. A large sheet of paint coming away indicates stripping is needed.
Third, tap the wall with your knuckles. A hollow sound may indicate detached plaster requiring plaster repairs. Fourth, look for staining, blisters or mould beside windows, outside the bathroom and behind wardrobes, where seepage warrants particular attention.
These are preliminary checks. A tradesperson should inspect the wall and measure moisture on site. Nippon Paint’s technical data requires substrate moisture below 6% and pH below 10[11]. Walls in older flats often need dehumidification and time to dry.
- Scrape, tape-test, tap and inspect
- Hollow-sounding plaster needs plaster repairs
- Confirm by measuring on site
You can swipe left or right on your phone to view the complete table.
| practice | Suitable wall condition | Main work stages | Company rate | Limitations |
|---|---|---|---|---|
| Turn oil directly (E03) | Sound existing paint with ageing, marks or nail holes only | Clean, patch holes, lightly sand, and top coat 2 times | HK$12 per sq ft, minimum HK$3,700 | Excludes major cracks and peeling paint |
| Local repairs (E02) | Mostly sound, with localised peeling or cracks | Strip loose paint locally, fill cracks and chips, apply moisture-resistant primer, sand, and apply 2 topcoats | HK$21 per sq ft, minimum HK$4,650 | Repaired areas may look slightly different under light from the side |
| Strip and redecorate (E01) | Widespread peeling, mould or an excessive build-up of paint | Strip back to the underlying plaster, apply moisture-resistant primer, skim coat 2–3 times, sand, and apply 2–3 topcoats | HK$39 per sq ft, minimum HK$7,450 | Longer programme and more dust |
Company’s published price list [1]. [1]
03
What precautions apply when stripping old lead-based paint?
The Department of Health’s Centre for Health Protection says some paint may contain lead. Keep children from chewing flakes and clear peeling or flaking paint promptly[9]. Paint used decades ago can have a different composition. Protect the area and clean thoroughly during stripping.
Modern water-based emulsions performed better. In 2014 the Consumer Council tested 10 such paints, all with VOC levels below the 50 g/L limit. Four brands contained traces of lead (20 to 38 ppm), within the environmental label requirements[7].
Keep children and pregnant residents away from the work area during stripping. Clear old paint flakes the same day. After work, damp-wipe the floor to raise less dust than dry sweeping.
- Some older paints may contain lead
- Keep children away during paint stripping
- Use a damp cloth to collect old paint fragments
「If light scraping with a fingernail dislodges old paint or leaves powder, strip back the affected coating. A sound wall with only ageing or discolouration can be repainted.」

04
What should I do if I find suspected asbestos?
The Environmental Protection Department recommends a survey by a registered asbestos consultant for asbestos-containing materials before major work in an older building[5]. If suspect asbestos-containing material is found during renovation, the Environmental Protection Department advises stopping work, closing off the area, keeping it damp and calling its hotline[5].
We work with registered asbestos consultants. If we encounter suspect material, we will stop work and arrange a survey by a registered asbestos consultant. A registered contractor will carry out any necessary asbestos work. HK CreateDesign is not a registered asbestos contractor and does not remove asbestos itself.
Ordinary residential wall paint does not necessarily contain asbestos, but some boards, ceilings and pipe lagging in older buildings may. We will flag suspect materials during the site measurement.
- A survey can be arranged before major renovation
- Stop work if suspect material is found
- Have a registered consultant and contractor handle the work
05
How seepage affects painting in older flats
The Buildings Department lists common sources of seepage including drains, water supply pipes, floor slab waterproofing and rainwater[8]. Report suspected upstairs seepage to the Joint Office of the Food and Environmental Hygiene Department and Buildings Department. Its procedures from 16 July 2026 include infrared thermography. In straightforward cases it can issue a Notification Letter in about 14 working days, giving the owner 28 calendar days to complete repairs[8].
From 17 August 2025, failure to comply with a Nuisance Notice can attract a maximum HK$25,000 fine plus HK$450 a day for a continuing offence. For a court-issued Nuisance Order, the maximum is HK$50,000 plus HK$600 a day[8].
If seepage originates inside your flat, such as from ageing bathroom waterproofing or old pipes, arrangeWaterproofingorPipe replacement. We use copper for pipe replacement and select waterproofing materials, including Sika products, to suit the location. Repaint only after the source is repaired and the wall has dried. See our guide to painting mould-affected walls.
- Identify the cause first.
- You can report seepage from the flat above
- Waterproofing or replacing pipes in your own flat
Example 1: combining three painting treatments in an older 550 sq ft flat
Assumptions
- Saleable area: 550 sq ft. Estimated work surface area: 550 × 3 = 1,650 sq ft [1].
- The living room and two bedrooms have 1,050 sq ft of mostly sound surface with local cracks: E02 at HK$21 per sq ft.
- The walls outside the kitchen and bathroom have widespread peeling across 600 sq ft: E01 at HK$39 per sq ft.
- 4 sets of timber doors and frames: E04 at HK$1,650 per set.
How to calculate quantities
- E02:1,050 × HK$21 = HK$22,050。
- E01:600 × HK$39 = HK$23,400。
- E04:4 × HK$1,650 = HK$6,600。
- Total: HK$22,050 + HK$23,400 + HK$6,600 = HK$52,050.
Estimated painting cost: HK$52,050. Applying E01 to all 1,650 sq ft would cost 1,650 × 39 = HK$64,350, a difference of HK$12,300.
Excludes seepage repairs, rendering, waste disposal, insurance and other work. Confirm the condition category on site. [1]

06
Refinish timber doors, frames and window sills together for a consistent finish
Freshly painted walls can make the old finish on timber doors and frames stand out. Our E04 painting rate is HK$1,650 per door-and-frame set[1], suitable when the timber door remains structurally sound and only the surface is worn.
Timber doors need their own coating system. Wall emulsion is unsuitable. If the door is split, warped or has loose hinges, repair it first or consider replacement.
Inspect the painted edges at sills, skirting boards and door frames. Lines should be straight, with no paint crossing onto the adjacent wall.
- Timber doors: HK$1,650 per set
- Timber doors need a different coating system
- Keep junction lines straight
You can swipe left or right on your phone to view the complete table.
| Item | Company rate | include | Exclusions and additional charges |
|---|---|---|---|
| E01 / E02 / E03 Wall painting | HK$39 / HK$21 / HK$12 per sq ft | Specify the work for each condition category | Repairing the source of seepage and reinstating render |
| E04 Timber doors and frames | HK$1,650 per set | Painting timber doors and frames | Replacing doors, hinges or locks |
| E05 Partial mildew removal with heavy oil | HK$1,250 per wall face | Treat localised mould and repaint | Leak investigation costs extra |
| B01 Cement-sand rendering | HK$43 per sq ft, minimum HK$2,350 | Rebuild the substrate where the wall is spalling or sounds hollow | Painting charged separately |
| A11 Construction waste | HK$4,200 per truckload | Disposal of large quantities of stripping debris | — |
| L02 Whole-flat works insurance | HK$6,700 | As required for the work | — |
Company’s published rates [1]. A separate small job is subject to a minimum site call-out charge of HK$2,000. [1]

07
Buying an older flat: how much time and money should you allow for repainting before moving in?
Repainting before moving into a newly purchased older flat is common. An empty flat allows the same stage to proceed throughout and the drying periods to overlap. Nippon Paint’s technical data gives 2 to 3 hours between topcoats and 7 days to full cure[11]. Where walls need stripping and skimming, allow at least 12 to 24 hours between coats of Nippon Paint Odour-less Wall Putty[13], so leave some leeway before the move-in date.
For a preliminary budget, our quick method estimates work surface area as the flat’s saleable area × 3[1], then choose each wall’s treatment by its condition. A 450 sq ft flat has an estimated 1,350 sq ft of surface. Whole-flat repainting: 1,350 × HK$12 = HK$16,200. Local repair treatment throughout: 1,350 × HK$21 = HK$28,350. Full stripping: 1,350 × HK$39 = HK$52,650[1]. In practice, a combination of all three often places the total between the extremes.
At handover, check for pre-existing seepage. Look for water stains outside the bathroom, beside windows and on ceilings. If you suspect an upstairs source, report it to the Joint Office[8]. If the source is inside your flat, first repair the waterproofing or replace the affected pipes.
- An empty flat gives the easiest access
- Classify the work by wall condition first
- Check for seepage at handover

08
Which season is best for painting an older flat?
Walls in older flats are often damp, and the season matters. Hong Kong Observatory averages for 1991–2020 give relative humidity of 82% in March, 83% in April and May and 82% in June, compared with 70%–73% from October to December[10].
Nippon Paint advises against painting at relative humidity above 85%, during rain or when rain is expected during drying[12]. In humid spring weather, stripped walls in older flats take longer to dry thoroughly.
Spring painting is possible. Allow more time, close the windows when dehumidifying and measure wall moisture before painting. HK CreateDesign’s painters find that the inside faces of external walls and the walls outside bathrooms in older flats dry slowest, so we start those areas first.
- Allow extra drying time in humid spring weather
- Avoid painting when humidity exceeds 85%
- Start with the slowest-drying area
Example 2: repainting sound walls in an older 700 sq ft flat for a colour change
Assumptions
- Saleable area: 700 sq ft. Estimated work surface area: 2,100 sq ft.
- Sound walls: E03 repainting throughout at HK$12 per sq ft [1].
- One 100 sq ft dark wall is changing to a light colour. One additional coat costs HK$4 per sq ft [1].
How to calculate quantities
- E03:2,100 × HK$12 = HK$25,200。
- Dark-to-light colour change: 100 × HK$4 = HK$400.
- Total: HK$25,200 + HK$400 = HK$25,600.
Estimated work cost: HK$25,600. Direct repainting is a sensible option when the existing walls are sound.
If work reveals loose old paint, the affected walls may need E02 or E01. We will agree the change with you before proceeding. [1]

09
How to deal with spalling, water stains and cooking grease on an older ceiling
Older ceilings commonly have three problems. First, mild yellowing or staining on a sound surface can be cleaned and repainted. Second, water stains and mould are often linked to an upstairs bathroom or pipes. Deal with the source first[8]. The third area is the ceilingConcrete spalling, or exposed reinforcement requires concrete repairs before skim coating and painting. See our guide to spalling concrete repairs.
Kitchen ceilings are exposed to grease and steam, which can cause peeling. Strip back paint that scrapes off easily. We suggest a moisture-resistant or wipeable finish. Nippon Paint’s Odour-less 5-in-1 moisture-resistant paint, for example, lists coverage of 13 to 14 m² per litre and a 2-hour recoating interval[12].
Older flats often have higher ceilings. Use a mobile working platform or step platform for ceiling painting. The Labour Department advises using ladders for access only[2]. Working at 2 metres or above is work at height. A ladder is unsuitable for carrying out the painting.[3]. Homeowners should avoid climbing a ladder to paint ceilings themselves to save money.
- Light staining may be suitable for repainting
- Trace the cause of water stains first
- Repair spalling concrete first
- Avoid standing on a ladder to paint the ceiling
You can swipe left or right on your phone to view the complete table.
| risk | Official guidance | How we handle it |
|---|---|---|
| Old lead-based paint | Some paint may contain lead. Remove peeling paint promptly and prevent children from chewing paint flakes [9] | Protect nearby surfaces and clean up during stripping. Keep children away from the work area. |
| Suspected asbestos-containing materials | Commission a registered asbestos consultant before major work in an older property. If suspect material is found unexpectedly, close off and wet down the area [5]. | Stop work immediately and arrange follow-up by a registered asbestos consultant and registered asbestos contractor |
| water seepage | Common sources include drains, water supply pipes, floor slab waterproofing and rainwater [8] | Find the source, waterproof or replace pipes as necessary, then repaint |
| Old wiring | Electrical work must be carried out by a registered electrical worker [2] | Assess whether rewiring is needed before painting and coordinate both jobs |
Official guidance is drawn from the Centre for Health Protection, Environmental Protection Department, Buildings Department and Labour Department. [9][5][8][2]
10
When does painting happen during an older flat renovation?
Renovating an older property usually involvesRewiring, replacing pipes, renovating the bathroom and kitchen, andMasonry and tiling. Painting usually comes last. The Labour Department advises that electrical work must be carried out by a registered electrical worker[2]. In older buildings,ageing electrical wiring. Assess this before painting to avoid reopening service chases in the finished walls.
Repair spalling concrete and exposed reinforcement first. Reinstate hollow plaster before skim coating and painting. Let filled service chases dry thoroughly to reduce cracking along the joints.
In an occupied flat, the work can proceed room by room. Stripping creates substantial dust, so set aside a separate room to live in. Our renovation noise guide covers working hours and noise arrangements.
- Finish plumbing, electrical work and masonry before painting
- Deal with spalling and hollow areas first
- Work room by room in an occupied flat
11
What do the experts and government departments advise?
Centre for Health Protection: Some paint may contain lead. Keep children from chewing flakes and remove peeling paint promptly.[9]. The Environmental Protection Department recommends a registered asbestos consultant survey before major work in an older building. If suspect material is discovered, stop work, isolate the area and spray water to suppress dust[5].
Buildings Department: Common sources of seepage include drains, water supply pipes, floor slab waterproofing and rainwater. Owners are responsible for repairs.[8]. The Labour Department advises checking workers’ Green Cards and the insurance policy required by the Employees’ Compensation Ordinance before work. Use ladders only for access and a mobile platform or step platform for work above ground level. Ventilate when using flammable substances such as thinners and avoid work that could ignite them[2].
The Environmental Protection Department also recommends ventilating through the windows and sealing the front door during work. Leftover paint and solvents are chemical waste and must be kept out of drains[4]. The Consumer Council recommends stating in old-wall painting quotes whether stripping is included[6].
- Official guidance covers lead, asbestos and water seepage
- Workers need a Construction Industry Safety Training Certificate (Green Card) and insurance
- Specify the areas to be stripped in the quote
Example 3: addressing an upstairs leak before treating a mouldy ceiling
Assumptions
- Mould on both the wall at the bathroom entrance and the corridor ceiling.
- Report suspected seepage from the flat above to the Joint Office [8].
- E05 local mould treatment and repainting costs HK$1,250 per affected surface. Leak investigation costs extra [1].
How to calculate quantities
- Source of seepage: await upstairs repairs. The Joint Office’s Notification Letter gives the owner 28 calendar days to complete repairs [8].
- Once both surfaces are confirmed dry: 2 × HK$1,250 = HK$2,500, above the minimum call-out charge of HK$2,000.
- For one surface, HK$1,250 is below the minimum charge, so the charge is HK$2,000.
Estimated work cost: HK$2,500. Address the source of seepage and let the wall dry fully before starting.
Problems caused by seepage outside the paintwork are excluded from the one-year warranty. We cannot control the timing of repairs upstairs. [8][1]

12
Six common mistakes when repainting an older flat
First, painting over loose old paint so both coats peel within months. Second, painting before resolving seepage. Third, leaving stripping out of the quote and asking for an extra payment once work starts.
Fourth, packing hollow plaster with filler. Fifth, stripping paint without covering the area, allowing flakes and dust to spread. Sixth, using wall paint on timber doors, where it can soon become tacky or lose colour.
We specify the condition category for each room in the quotation. If we find weaker paint than expected, we will photograph it and agree any change to the method and price with you first.
- Strip loose old paint
- Specify the areas to be stripped in the quote
- Agree any changes first
You can swipe left or right on your phone to view the complete table.
| Sequence | Application stage | Pay attention to |
|---|---|---|
| 1 | Measure, scrape, tap-test and check moisture levels | Classify each wall by its condition |
| 2 | Address seepage and concrete spalling | Resolve the moisture source before painting |
| 3 | Electrical and plumbing work, such as rewiring or replacing pipes | Fill service chases completely |
| 4 | Plaster repairs where hollow areas are found | Allow to dry thoroughly |
| 5 | Stripping, sealing, skim coating, primer and topcoats | Follow the manufacturer’s drying times |
| 6 | Timber doors, frames and edge finishing | Address this last |
| 7 | Inspection and cleaning | Shine light across the wall |
The usual sequence may change with site conditions. Consult Nippon Paint’s technical data for drying times [11]. [11]
13
How should I inspect the paintwork in an older flat?
Shine a light across the wall to check for blisters, trowel marks, ripples and the old colour showing through. Transitions between stripped and repainted areas should be smooth. Look for water stains beside windows, outside the bathroom and behind wardrobes.
Check timber door frames for straight painted edges and drips. There should be no paint at the junction of the skirting and floor. See our handover paint snagging checklist.
ourPaintingOur one-year warranty covers paint cracking, blistering and peeling unless the damage was deliberate. It excludes underlying problems caused by leaks or seepage. We can quote separately for those repairs at a preferential rate.
- Shine light across the wall
- Check any areas with a history of seepage
- Keep the painted edges on timber doors straight
14
How we manage painting work in older flats
The HK CreateDesign team has over 10 years of project experience, including older flat renovations,Whole-flat renovation, we can coordinate painting, plastering, waterproofing, rewiring and pipe replacement. At measurement, we scrape and tap-test the walls, check moisture, look for seepage or suspect materials, then quote room by room.
The minimum charge for a site visit for a single small job is HK$2,000. For local mould or minor repairs, send photos to WhatsApp 5243 7747 for a preliminary quotation. On-site measurement is free through 31 December 2026 for two or more work items, with no deposit. After that, the HK$500 fee is credited against the order.
For a free quotation from the HK Create Design team, WhatsApp 5243 7747 or visit our Wong Tai Sin shop, Monday to Saturday, 10:00–18:00.
- Assess each room separately
- Flag suspect materials before work
- Send photos for small repairs
Advice from our tradespeople
「If light scraping with a fingernail dislodges old paint or leaves powder, strip back the affected coating. A sound wall with only ageing or discolouration can be repainted.」
「Older buildings from the 1970s and 1980s may contain lead paint. Arrange dust control and protection before stripping it, and have the paint tested first if needed. Allow time for these precautions.」
「Trace the leak before painting a water-stained wall. If the source remains, water marks may show through again within months and the repainting cost is wasted.」
FAQ
14 practical questions answered
01Can I paint directly over a spalling ceiling in an older flat?
No. Repair spalling concrete and exposed reinforcement before skim coating and painting.
02When is the best time to paint an older flat?
Hong Kong Observatory figures show average relative humidity of 70%–73% from October to December, the drier months[10]. In other months, allow more time and use dehumidification.
03Does old paint always need stripping in an older flat?
Not necessarily. Sound paint can be repainted at our published rate of HK$12 per sq ft. Widespread peeling requires stripping at HK$39 per sq ft[1].
04How can you tell if old paint needs stripping?
Scraping, tape testing, tapping and checking for water stains give an initial indication. Confirm on site and strip loose paint film[11].
05Could old paint contain lead?
The Centre for Health Protection says some paint may contain lead. Keep children from chewing paint flakes and remove peeling paint promptly[9].
06What if asbestos is found?
The Environmental Protection Department advises stopping work, closing off the area, wetting it down and calling its hotline[5]. We will stop work and arrange follow-up by a registered asbestos consultant and a registered asbestos contractor.
07What can I do about ceiling mould caused by seepage from upstairs?
You can report seepage to the Joint Office. Owners have 28 days to arrange repairs after an Notification Letter is issued[8]. Repaint after the source has been addressed.
08How much does repainting an older flat cost?
For example, a 700 sq ft flat with sound walls gives an estimated 2,100 sq ft of painting at HK$12 per sq ft = HK$25,200[1]. Areas needing repairs or stripping cost extra.
09Can the timber doors be painted at the same time?
Yes. Our E04 painting rate for a timber door and frame is HK$1,650 per set[1].
10Does paint stripping create a lot of dust?
Yes. Cover the work area and keep children and pregnant residents away while work is under way. Clean with a damp cloth afterwards.
11Do I need to rewire an older flat when repainting?
It depends on the condition of the wiring. Electrical work must be carried out by a registered electrical worker[2]. Assess both before painting.
12Does paint stripping generate a lot of debris?
Stripping the whole flat generates more debris. Our waste removal rate is HK$4,200 per truckload, charged separately as needed[1].
13Does the warranty cover seepage damage?
Paint cracking, blistering and peeling are covered for one year. Problems outside the paintwork caused by leaks or seepage are excluded, although we can quote for repairs at a discounted rate.
14Can I stay in the flat while the work is under way?
Work can proceed room by room. Stripping produces dust, so keep a separate room available to live in and maintain ventilation[4].
CHECK THE BASIS
Data and technical basis, sources can be verified
- [1]HK Create Design 2026 detailed renovation estimates and published prices (117 items) Accessed: 2026-11-03
- [2]Labour Department: Occupational safety in renovation and maintenance work for owners and tenants of commercial and residential premises Accessed: 2026-11-03
- [3]Labour Department: Overview of Work-at-Height Safety Accessed: 2026-11-03
- [4]Environmental Protection Department: Paint odour from renovation work and disposal of leftover paint Accessed: 2026-11-03
- [5]Environmental Protection Department: Asbestos removal Accessed: 2026-11-03
- [6]Consumer Council: Renovation quotations should be detailed and teach you one by one in 12 major areas Accessed: 2026-11-03
- [7]Consumer Council, CHOICE issue 457: Trace levels of harmful substances in emulsion paints, including VOCs, lead or arsenic Accessed: 2026-11-03
- [8]Buildings Department: Frequently Asked Questions on Water Seepage Problems Accessed: 2026-11-03
- [9]Department of Health, Centre for Health Protection: lead Accessed: 2026-11-03
- [10]Hong Kong Observatory: Monthly averages of meteorological elements in Hong Kong (1991-2020) Accessed: 2026-11-03
- [11]Nippon Paint Hong Kong: 2nd Generation Super 5-in-1 Interior Emulsion Paint Technical Data Sheet Accessed: 2026-11-03
- [12]Nippon Paint Hong Kong: Odour-less 5-in-1 (Moisture-Proof) Interior Emulsion Paint Technical Data Sheet Accessed: 2026-11-03
- [13]Nippon Paint Hong Kong: Nippon Paint Odour-less Wall Putty Accessed: 2026-11-03